Gas Processing Units for Balgymbaeva & Makat Fields
Contracted in 2012 and completed in 2013, SPEC rendered the Design, Detailed Engineering and Fabrication of two (2) Glycol Dehydration Units (TEG and EG) for the Treatment of Flare Gas for Geo Energy Group. The additional scope also included two (2) Separator Packages, Pumping Skid, Condensate Stabilization Unit, Heat Exchangers and Control and Safety Shutdown System
Gas Preparation Unit at Makat includes the following:
- Inlet Separator and Valve Skid
- Skid Mounted TEG Gas Dehydration Unit (6.7 GPM)
- EG Unit
- JT System
- Condensate Stabilization System
- HAZOP, Control Systems
- Metering, Flare and Instrument Air Packages
Geo Energy Group
Kazakhstan
2013
Engineering, Procurement, Construction, Commissioning + Operations & Maintenance
Upstream Oil & Gas
SPEC's Project Execution Process
Being vertically integrated, SPEC performs engineering, design, project management, procurement, manufacturing, and construction services by utilizing in-house expertise from concept to commissioning of facilities.
In the traditional turnkey approach, these are often performed by separate firms thereby giving SPEC a strong edge to execute projects within budget, centralized management, and shorter delivery cycles – assuring our clients the superior quality and value in every stage of the project.
SPEC follows this inertly rigorous 10-step execution plan in its project endeavor…
our global & regional offices
let us know how we can help you
Share this:
- Click to share on X (Opens in new window) X
- Click to share on Facebook (Opens in new window) Facebook
- More
- Click to share on LinkedIn (Opens in new window) LinkedIn
- Click to share on Reddit (Opens in new window) Reddit
- Click to share on Tumblr (Opens in new window) Tumblr
- Click to share on Pinterest (Opens in new window) Pinterest
- Click to share on WhatsApp (Opens in new window) WhatsApp
- Click to email a link to a friend (Opens in new window) Email