Our Work | Hunt 2020

10,000 BPD Early Production Facility (Train 2)

This project was contracted in March 2019 and completed in early 2020. SPEC provided the Engineering, Procurement, Fabrication, Construction and Commissioning Management of Train 2 – 10,000 BPD Very high sour oil early production facility at Ain Sifni Block including the following major processing equipment:

1.Direct fired heater, Inlet and Intermediate

2.Inlet Cross Exchanger

3.LP Separator

4.Electrostatic Dehydrator

5.Electrostatic Desalter

6.Remote I/O Panels

Unit PLC based control panels

Client:

Hunt Oil Middle East Ltd.

Location:

Kurdistan, Iraq

Completion:

2020

Services:

Engineering, Procurement, Construction, Commissioning 

Business Portfolio:

Upstream Oil & Gas

our global & regional offices

let us know how we can help you

Our Work | Gulf Keystone

Provision of Permanent Drill Fluid Handling System

In December 2018, Gulf Keystone Petroleum entrusted SPEC with the Design Engineering, Project Management, Procurement, Fabrication, and Commissioning of Two (02) Trains of 10000 BOPD Permanent Drill Fluid Handling System at GKPI’s facilities PF1 and PF2 at their Shaikhan Block in Kurdistan Region of Iraq.

The following packages were supplied as part of the work scope:

  • Process Heater
  • 3 Phase Separator
  • Water H2S Stripper Package
  • CPI Separator Package
  • Storage Tank Transfer Pump
  • Water Storage Tank
  • Water Transfer/Loading Pump
  • Unit PLC based Control System
Client:

Gulf Keystone Petroleum

Location:

Kurdistan, Iraq

Completion:

2020

Services:

Engineering, Procurement, Construction, Commissioning 

Business Portfolio:

Upstream Oil & Gas

our global & regional offices

let us know how we can help you

Our Work | Frontier

8,500 BPSD Vacuum distillation unit

Frontier Company awarded this project to SPEC in September 2019 to provide Engineering, Procurement, Construction and Commissioning with 3-mos Operation & Maintenance for a detailed design and module fabrication for one train 8500 BPSD vacuum distillation unit and associated utilities in Arbat, Suleymaniyah, Iraq. 

Client:

Frontier Company

Location:

Arbat, Iraq

Completion:

Target – July 2022

Services:

Engineering, Procurement, Construction, Commissioning 

Business Portfolio:

Upstream Oil & Gas

our global & regional offices

let us know how we can help you

Our Work | Al Shabakha

Two (02) Trains of 8500 BPSD VDU & Auxiliaries

This VDU project was awarded to SPEC in 2018 by Al Shabaka – Al Thahabiya Golden Oil Refinery, for final completion in 2022 amidst all the challenges of the pandemic. SPEC facilitated the Design Engineering, Project Management, Procurement, Fabrication, Construction Management, Commissioning Management with Operations and Maintenance of Two (02) Trains of 8500 BPSD Vacuum Distillation Unit (VDU) with all related utilities, tankages, loading/unloading, auxiliaries and buildings.

Client:

Al Shabaka / Golden Oil Refinery

Location:

Najaf, Iraq

Completion:

Target – July 2022

Services:

Engineering, Procurement, Construction, Commissioning + Operations & Maintenance

Business Portfolio:

Upstream Oil & Gas

our global & regional offices

let us know how we can help you

Our Work | Fox Oil

6500 BPSD Naphtha Reforming Gasoline Complex

In June of 2019, SPEC was awarded a big project by Fox Oil Company for an Engineering, Procurement, Construction, and Commissioning of a 6500 BPD Gasoline Production Complex in Sulaymaniyah, Iraq. The production facility will include all related utilities, tankages, loading/unloading, auxiliaries, and buildings. The main process unit includes Naphtha HDT. Amidst the pandemic, the project completion is set in early 2022.

Client:

Fox Oil Company

Location:

Suleymaniya, Iraq

Completion:

Target – April 2022

Services:

Engineering, Procurement, Construction, Commissioning + Operations & Maintenance

Business Portfolio:

Upstream Oil & Gas

our global & regional offices

let us know how we can help you

Our Work | Al Barham Group

12,000 BPSD Modular Gasoline production complex

SPEC was awarded this remarkable project in late 2019, prior to the pandemic slow-down. Despite the challenges, this endeavor pushed on with its services of Design Engineering, Project Management, Procurement, Fabrication, Construction, Commissioning, Training with Operations and Maintenance of a 12,000 BPSD Gasoline Production Complex with all related utilities, tankages, loading/unloading, auxiliaries, and buildings. The main process units include Naphtha HDT, Splitter, C5/C6 Isomerization, and Semi Regen Reformer Unit. It is expected for the completion stage in the first half of 2023.

Client:

Al Barham Group

Location:

Kirkuk, Iraq

Completion:

Target 2023

Services:

Engineering, Procurement, Construction, Commissioning + Operations & Maintenance

Business Portfolio:

Upstream Oil & Gas

our global & regional offices

let us know how we can help you